Camino Ramon is scheduled to be repaved between Bollinger Canyon Road and Norris Canyon Road on 06/28/13 and 06/29/13.
Only one lane on each side will be closed at a time. One lane should remain open with traffic controllers in place.
Camino Ramon is scheduled to be repaved between Bollinger Canyon Road and Norris Canyon Road on 06/28/13 and 06/29/13.
Only one lane on each side will be closed at a time. One lane should remain open with traffic controllers in place.