Watch For Construction At Chevron-San Ramon 2/8 – 2/14

The Chevron Park main entrance will be reduced to one lane upon entering the property, to support installation of bollards around the Guard House.  Traffic control and barricades will be present to guide drivers to the appropriate lane (please see below map).

Monday – 2/8/16 between 2 and 5 PM

Tuesday- 2/9 thru 2/14/16 between 7:30 AM and 4:30 PM

image004

Leave a Reply

Your email address will not be published. Required fields are marked *