Upcoming construction activity for the Express Lanes on I-680 between Walnut Creek and San Ramon requires a temporary, nighttime ramp closure. The construction activity will include the installation of conduit under the ramp to connect to power sources. The following ramp closure is scheduled:
• The southbound Rudgear Rd. on-ramp is scheduled to be closed from 8 p.m. until 5 a.m. each night Monday, May 16 through Friday, May 20.
For more information see below.
SB Rudgear On-Ramp Construction Notice 20160510 Final